Rhino Metal Roofing roll partly unrolled, blue anti-glare mesh face with Rhino Roofing print and foil on the roll

Rhino Metal Roofing RP-51MR Heavy Duty Reflective Roof Sarking

1350 mm x 30 m (40.5 m²)
$71.00
Sale price  $71.00 Regular price 
Skip to product information
Rhino Metal Roofing roll partly unrolled, blue anti-glare mesh face with Rhino Roofing print and foil on the roll
1/3

Rhino Metal Roofing RP-51MR Heavy Duty Reflective Roof Sarking

$71.00
Sale price  $71.00 Regular price 
GST inclusive

Opening Offer: 5% off orders over $1,000, 7% over $2,500, 10% over $4,000. Ends 30 November. Offer details

Dispatch: Most orders are processed the same day. Metro delivery: Usually 1–3 business days. We do our best to get most items out on the next business day.

Delivery to VIC and NSW: $55 in metro Melbourne and metro Sydney, $99 in the outer ring around both cities, $149 anywhere else in the two states · Local pickup from Epping, VIC by arrangement · Shipping details

Rhino Metal Roofing RP-51MR is a heavy duty reflective roof sarking made by Thor Building Products for residential and commercial metal roofs. The foil is bonded to a reinforcing polymer mesh coloured blue to cut glare while it goes on.

Strength and fire

Thor rate it heavy duty: tensile strength at least 12.5 kN/m along the roll and 7.5 kN/m across, edge tear at least 80 N both ways. The flammability index is Low, below 5 to AS 1530.2. It suits BAL 12.5 to FZ under AS 3959 section 3.10, except exposed installations in fire control rooms or fire-isolated exits.

A vapour barrier, so ventilate in the cold

This is a Class 2 Vapour Barrier at 0.011 µg/N.s. Where daytime temperatures fall below 5 °C, Thor say the roof must be well ventilated and moist air from the house exhausted outside. Our article on metal roof condensation explains why.

What it adds thermally

The data sheet says up to R1.3 may be added to the insulation system in a roof. No roof build-up is given, so read it as an upper limit, not a rating for the foil. Thor recommend at least 20 mm of air space next to the foil face.

Ordering and site notes

Both rolls are 1350 mm wide: 30 m covers 40.5 m², 60 m covers 81 m². Install to AS/NZS 4200.2 with 40 mm of sag between trusses and expect up to 2% shrinkage. Sheet the roof as soon as possible and keep the rolls dry. Full figures are in the table below.

Rhino · Aluminium foil bonded to a blue reinforcing polymer mesh with a flame retardant adhesive · Roof sarking under residential and commercial metal roofs application

Sizes stocked

Roll sizeCoverageProduct code
1350 mm x 30 m40.5 m²RP-51MR-30
1350 mm x 60 m81 m²RP-51MR-60

Barrier classifications

Vapour classification Class 2, Vapour Barrier
Vapour permeability 0.011 µg/N.s
Water control classification Water Barrier
Electrical conductivity Conductive

A vapour barrier stops moisture from the house passing through it, so in cold climates the roof space has to be ventilated instead.

Strength

Duty Heavy
Tensile strength machine direction min 12.5 kN/m
Tensile strength lateral direction min 7.5 kN/m
Edge tear resistance machine direction min 80 N
Edge tear resistance lateral direction min 80 N
Thickness Under 1 mm

Thor publish minimum strength values, not measured test results.

Fire

Flammability index Low, under 5 (AS 1530.2)
Bushfire Attack Level BAL 12.5 to FZ (AS 3959 section 3.10)
BAL exception Except in exposed installations in fire control rooms or fire-isolated exits (NCC 2019 Volume 1 Specification C1.10)
Fire hazard properties Satisfies BCA Part 3.7.1 Fire Hazard Properties

Thor's fire statements cite NCC 2019 clause numbers, so check them against the NCC edition that applies to your job.

Thermal

Emittance Reflective
Emittance of reflective face max 0.05
Added R-value in a roof (manufacturer statement) Up to R1.3 may be added to the insulation system
Air space Minimum 20 mm recommended next to the reflective foil face for maximum insulation value

Thor give no roof build-up for the R1.3 figure, so treat it as an upper limit, not a rating for the foil.

Handling and limits of use

Anti-glare face Polymer mesh treated blue to reduce reflective glare when installing
Shrinkage Up to 2% can be expected
Storage Store in a dry area; weatherproof only after installation
Cladding Install the external cladding as soon as possible
Concrete and mortar No contact with wet concrete or mortar
Structures For use in enclosed structures
Cold climates Where daytime temperatures are below 5 °C the roof must be well ventilated and moist air from the dwelling exhausted outside

Compliance

Standard AS 4200.1-2017 Pliable Building Membranes
BCA Satisfies BCA specifications and requirements for Reflective Foil Laminates
Installation standard AS/NZS 4200.2

Fitting notes

Install to AS/NZS 4200.2, the installation requirements for pliable building membranes. Thor recommend 40 mm of sag between trusses and at least 20 mm of air space next to the reflective foil face to get the full insulation value. Expect up to 2% shrinkage. Fit the roof sheeting as soon as possible after the sarking, keep the membrane away from wet concrete and mortar, and store the rolls in a dry area until they go on. Where daytime temperatures fall below 5 °C, the roof must be well ventilated and moist air from inside the dwelling exhausted outside.

Figures are taken from the Thor Building Products data sheet for Rhino Metal Roofing RP-51MR, dated July 2022. The manufacturer document is linked above. Thor Building Products can change specifications without notice, so check the current sheet before specifying on a job.

Common questions

How much roof does one roll cover?

Both rolls are 1350 mm wide. The 30 m roll covers 40.5 m² and the 60 m roll covers 81 m². That is the gross roll area, so allow extra for laps and offcuts.

Is it a breathable sarking?

No. Thor classify it as a Class 2 Vapour Barrier with a vapour permeability of 0.011 µg/N.s, and as a Water Barrier. Where daytime temperatures fall below 5 °C, Thor require the roof to be well ventilated and moist air from inside the dwelling exhausted outside.

What R-value does it give?

Thor state that up to R1.3 may be added to the insulation system when it is installed in a roof. The sheet gives no roof build-up for that figure, and Thor recommend at least 20 mm of air space next to the foil face to reach its maximum value.

Can it be used in a bushfire prone area?

Thor state it is suitable for BAL 12.5 to FZ under AS 3959 section 3.10. The exception is exposed installations in fire control rooms or fire-isolated exits, which Thor reference to NCC 2019 Volume 1 Specification C1.10.

How much sag should I leave between trusses?

Thor recommend 40 mm of sag between trusses. Expect up to 2% shrinkage as well, and install to AS/NZS 4200.2.

How strong is it?

It is rated heavy duty. Tensile strength is at least 12.5 kN/m in the machine direction and 7.5 kN/m in the lateral direction, and edge tear resistance is at least 80 N both ways.

Can it be left exposed before the roof sheeting goes on?

Not for long. Thor say the external cladding should go on as soon as possible and that the membrane is weather proofed only after installation. It is for use in enclosed structures.

Cannot see your question? Ask our team and we will get you an answer.

Answers use the Thor Building Products data sheet for Rhino Metal Roofing RP-51MR, July 2022.

You may also like